Home ProductsAthletics Running Track

400 Meters Full PU Material Athletics Running Track Surface / High School Running Tracks

400 Meters Full PU Material Athletics Running Track Surface / High School Running Tracks

400 Meters Full PU Material Athletics Running Track Surface / High School Running Tracks

Product Details:

Place of Origin: China
Brand Name: JRace
Certification: IAAF
Model Number: JRace

Payment & Shipping Terms:

Minimum Order Quantity: 500square meters
Price: USD 10-20 per square meter
Packaging Details: Polyurethane liquid: iron barrel & plastic barrel
Delivery Time: About 10 days after deposit
Supply Ability: 50000Ton per year
Contact Now
Detailed Product Description
Application: For Stadium Surface Color: Red Generally
Thickness: Customized Oversea Installation: Available
Flammability: Bf1-S Hardness JIS A: 50-70
High Light:

high school running tracks

,

all weather running track

Full PU Material Athletics Running Track Surface  Apply to 400 Meters Red Color Track

 

JRACE running ways are eco-friendly, seamless, cushioned, spike resistant surfaces with area, mixed or point elastic properties.

The high performance, seamless surface, is an in-situ applied rubber base layer, covered with multiple layers of an elastomeric structural spray polyurethane wear layer.

JRace running ways are water permeable, spike resistant, UV and all weather resistant.

They provide a durable track surface under all weather conditions.

And are suitable for outdoor athletic facilities, multipurpose sports facilities and playgrounds.

 

Product Data

 

Thickness(mm) 13
Force Reduction % 36.0
Vertical Deformation mm 1.30
Skid Resistance BPN20°C 53
Tensile strength MPa 0.56
Elongation at Break % 51.7
Flame Retardance 1
Test Conclusion

Pass GB/T22517.6-2011;GB/T14833-2011

 

 

 

Product Package

 

No Item Specification
1 PU Group A 15kg/200kg/barrel
2 103#Binder Glue 20kg/200kg/barrel
3 105#Binder Glue 20kg/200kg/barrel
4 PU 1:4 Primer A 15kg/200kg/barrel
5 PU 1:4 Primer B 30kg/300kg/barrel
6 PU Top Coat A 15kg/200kg/barrel
7 PU Top Coat B 30kg/300kg/barrel
8 Making Paint-White 5.6kg/barrel
9 Making Paint-Yellow, Blue, Green 1.2kg/barrel
10 Iron Oxide Red 25kg/barrel
11 Binder resin Material 15kg/210kg/barrel
12 Dryer 15kg/180kg/barrel
13 SBR Granule 25kg/bag
14 EPDM 25kg/bag

 

Installation steps

Firstly, clean the concrete base and use the single component glue to seal the bottom. After that, mix totally the SBR granules with the single component glue in the rate of 1:7, then, flat the material to the tracks by paver. Next, spray the surface layer. When the surface is dry, can mark the white marking line.

Pls note that the layout, track lines and event markings are in accordance with the latest edition of the IAAF rules and regulations. After maintain 20 days, can run on the racks.

 

Why Choose JRace

  • Projects based on China, spreaded all over the world
  • JRace has its own brand, including R&D department and installation service.
  • Awarded ISO9001, ISO14001, OHSAS18001, IAAF, ITF certified etc.
  • National High-tech Enterprises.
  • Credit Well-kept Enterprises.
  • Being listed in the Government Procurement List.

The establishment of effective brand building of the road,the company developed a more standardized,broad.In the manufacturing field,we have made a variety of industry certification authority;in the field of business we get positive recognition from all sectors of society.Is the quality,detail,seriously,insisting that the brand is more drnamic;standard,responsibility,honor and encourage us to carry over the mission,and creat the future.

Contact Details
Guangzhou JRace Athletic Facilities Co., Ltd. 

Contact Person: robert

Tel: +8613760810406

Send your inquiry directly to us (0 / 3000)

Other Products